WASHINGTON STATE LABOR & INDUSTRIES

>Now requiring all electricians to carry photo ID on jobsites.

> New 2008 exams coming soon for Administrators & Electricians

For more information, go to www.lni.wa.gov

____________________________________________________________

IDAHO DIVISON OF BUILDING SAFTY

Effective date as of July 2008; The 2006 International Mechanical Code and parts of the International Fuel Gas Code and Parts V and VI of the International Residential Code. For information on licensing, permits, inspections, and code issues go to www.dbs.idaho.gov.

 

NEEA DUCTLESS HEAT PUMP PROJECT CONTRACTOR EVENT LINK

http://www.nwductless.com/index.php?option=com_wrapper&view=wrapper&Itemid=106

The purpose of inverter-driven ductless heat pumps to displace electric resistance heat in single family homes across the region.  This demonstration will aim to determine the costs and energy saving potential of ductless heat pumps in this application and pave the way for accelerated market adoption in the future.

______________________________________________

                                   North Idaho Code Enforcers (N.I.C.E.) Nov 2009 Update

                                                                PO BOX 1555

                                                          Coeur d’Alene Idaho 83816                                                       

 

UPDATED MECHANICAL PERMIT MEMORANDUM

As announced to the public in June of this year, beginning January 1, 2010, the jurisdictions listed below will begin seeking compliance with Section 403.6 of the 2006 International Energy Conservation Code and Sections M1401.3 & M1601.1 of the International Residential Code.  Compliance with these codes is required by Idaho Statute. These Code sections require that all gas/electric forced air heating and cooling equipment be sized based on load calculations in accordance with ACCA Manual J, and duct systems are sized and constructed in accordance with ACCA Manual D, or other approved methods.  If an AC coil is installed without an AC unit, the system shall be sized as if the AC unit were installed.  Accurate documentation which demonstrates compliance will be required at the time of submittal for new construction building permits. Sizing of replacement or retrofit equipment will only apply to systems that were submitted for permits after January 1, 2010.  The submittal documents shall consist of the following:

  • ACCA Manuals J and D worksheets either in paper and pencil or spreadsheet. The free ACCA spreadsheets and a very good tutorial on how to use them are available at http://www.acca.org/speedsheet/; or
  • ACCA certified software reports.   The software is available for purchase at http://www.acca.org/store/; or
  • Other methods which may be approved in the future by the jurisdictions; and
  • The Manufacturer’s data sheets for the specific proposed HVAC appliances; and
  • A mechanical plan drawing which demonstrates the locations, sizes, and specific fittings of the duct system.

In the field, the system that is installed will be inspected for compliance with the approved mechanical plan.  

Some of the methods require directly referencing the appropriate ACCA Manuals, which can be purchased online from ACCA at http://www.acca.org/store/.  For the convenience of contractors and the public, N.I.C.E. will be donating these ACCA Manuals to the major area libraries in the near future.

In addition to the basic overview training that has already been provided, further training will be made available in the coming months in an effort to assist in making an easier transition toward these requirements.  As always, please feel free to contact the appropriate jurisdiction to clarify their submittal requirements, but please remember that it is the responsibility of the applicant to prepare the documents for submittal. 

Please note:  Jurisdictions whose inspections are performed by the Idaho Division of Building Safety should contact them directly for their specific requirements.

Updated November 25, 2009: City of Post Falls, City of Coeur d'Alene, City of Rathdrum, Idaho Division of Building Safety Area 1, Kootenai County, City of Hayden Lake, City of Sandpoint, City of Spirit Lake.

                                                   ____________________________________

     To learn more about the Registered Dealer Network of contractors or the Northwest HVAC/R Association, call (509) 747-8810 or (800) 786-3148

 

 

 


 

Training Center

 

Home | About Us | Member Services | Training Center Services | Association Training Classes | Resources | Contact Us